1:Part Anlysis.
we provide feasibility report (DFM) after receive final 3D part data

2: Customer Tooling Standard.
Have a internal meeting and learnig customer tooling standard with all engineering team

3: Mould Specification Sheet.
Detailed mould specification sheet as per the customer's mould requirement which includes mould steel,mould size and injection machine etc will be provided to clienet.

4: Mould Drawing Design.
After we receive confirmation of the mould specification sheet, we will provide 3D mould drawing with 3~5 working days,2D will be convert from 3D if customer requested it.

5: Mould Flow Analsis Report.
We wil provide mold flow analysis report when we receive confirmation of mould feedback.

6: Mould Manufacture Schedule.
Once we get approval of mould drawing from customer, we will start to order mould steel and machining,during this period, we will provide weekly report with some updated process photos from the moldbase,cavity,core,electrodes,components,CNC machining,EDM,wire cut,polishing and fitting every week to shown what we have done in last week till the mould will be finished.

7: First Article Inspection Report.
Mould sample video, part picture, FAI report, injection parameter list, parts shipment waybill will be snet to customer as a complete mould trial report from each mould sampling, also we will issue with problem, action and lead time will be provided to customer.

8: Mould Shipment.
Our mold makers will check mould according to mould drawing, Meanwhile,final mould drawing,muld checking list, steel certifications, injection parameter, electrodes will be shipped together with moulds. Also related files will be sent to customer by email or sendspace/mailbigfile as backup.